As a continuation of its Drews Landing drilling campaign, Rocksource ASA Group announced the completion of the State of Texas #3 well. The well was drilled as a production well on the east side of the Drews Landing south fault block. The well reached total depth/TD (11,777 ft) on the 24th of May 2007 without HSE incidents. Subsequent wireline logging indicated the presence of hydrocarbons. The well is now being prepared for completion. Following further testing it will be producing gas to sales as soon as possible after Rocksource has received formal approval from the Railroad Commission of Texas (RRC). After the completion of State #3 the rig was moved to the north where the Morian #6 well was spudded on the 8th of June. This well will be deviated and is designed to optimize production from multiple zones following the successful application for a co-mingling permit from RRC. Source : www.rigzone.com
June 16, 2007
Rocksource: Texas Drilling on Schedule
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment